50 MW Tsetsii Wind Power Plant Project
Duration
2017-2019
Completed
Client
Vestas Mongolia LLC
Location
Umnugovi Province

Scope of Work

  • 110 kV Overhead Transmission Line (OHTL)
  • 35 kV Cable Line
  • Design of 110/35 kV Substation
  • Material Supply
  • Construction and Installation
  • Testing and Commissioning

Project Summary

MCS International LLC successfully implemented the 50 MW Wind Power Plant Project as the EPC contractor in Tsogttsetsii Soum of Umnugovi Province.

Within the scope of the project, 2 MW wind turbines were installed, along with a 35 kV cable network to transmit the generated electricity, a 110/35 kV substation equipped with a full SCADA system, and a 110 kV overhead transmission line connecting to the Tavantolgoi substation.

Environmental benefits of the project include:

  • Reduction of 120,000 tons of coal consumption annually
  • Saving 1.6 million tons of water
  • Reduction of CO₂ emissions by 180,000 tons per year

This project contributes significantly to clean energy generation and environmental sustainability in the region.