Ore Handling System Construction
Duration
2025–2030
Ongoing
Client
Oyu Tolgoi LLC
Location
Umnugovi province

Scope of Work
Construction
Project Summary
The Oyu Tolgoi underground mine, located in Khanbogd soum of Umnugovi province, targets an average daily production of 95,000 tonnes of ore using the block-caving method. The Ore Handling System (OHS) comprises the facilities and infrastructure required to reliably and efficiently transfer ore from the production level to the haulage level through an approximately 30-meter ore pass.
Underground Mine – Production and Haulage Levels:
- Annual maintenance work for 4 stations, totaling 20 stations
- Repair and maintenance of station facilities
Underground Mine – Haulage Level, Panel 2:
- Installation of 8,812 meters of pipeline
- Construction of 3,564 meters of roadway
Ore Handling Station Maintenance Works:
- Chute rock box liner
- Chute lip liner
- Rock box liner
- Ore pass inlet liner
- Ore pass lip liner
- Screen panels
- Grizzly support steel